Construction Updates

September 4, 2006

      Work Activities this Week

  • Site Work: Sanitary Sewer Lines, Storm Drainage, Water Distribution System, Site Grading
  • Floor 1: Electrical Trim / Terminations, Finish Carpentry & Millwork, Fire Protection Trim
  • Floor 2: Lighting Fixtures, Plumbing Fixtures & Trim, HVAC Trim, Electrical Trim / Terminations, Fire Protection Trim
  • Floor 3: Painting, Electrical Trim / Terminations, Plumbing Fixtures & Trim
  • Floor 4: Hang / Tape / Finish Sheet Rock, Painting
  • Floor 5: Fireproofing, Rough Carpentry, Interior Framing, HVAC Rough-In (RI), Plumbing RI, Hollow Metal Door Frames, Electrical RI at Walls, Mechanical Insulation
  • Roof / Building Envelope: Exterior Wall Insulation (Batt & Rigid), Weather-Resistive Barrier (Tyvek), Masonry, Metal Roof Panels / Flashing & S.M.
  • Building - All Floors: Automatic Controls System, Metal Railings

 

 

 