      Work Activities this Week

  • Site Work: Sanitary Sewer Lines, Storm Drainage, Water Distribution System
  • Floor 1: Finish Carpentry & Millwork
  • Floor 2: Lighting Fixtures, Electrical Trim / Terminations, Seismic - Expansion Joints / Sheet Rock, Finish Carpentry & Millwork
  • Floor 3: HVAC Trim, Electrical Trim / Terminations, Seismic - Expansion Joints / Sheet Rock, Lighting Fixtures, Cabinets - Plastic Laminate Faced
  • Floor 4: Hang / Tape / Finish Sheet Rock, Painting, Seismic - Expansion Joints / Sheetrock, Acoustical Ceiling Grid, Lighting Fixtures
  • Floor 5: HVAC Trim, Rough Carpentry, Interior Framing, HVAC Rough-In (RI), Plumbing RI, Seismic - Expansion Joints, Hollow Metal Door Frames, Electrical RI at Walls, Install Mechanical Equipment, Insulation: Batt
  • Roof / Building Envelope: Exterior Walls Insulation (Batt & Rigid), Weather-Resistive Barrier (Tyvek), Masonry, Windows, Metal Roof Panels / Flashing & S.M.
  • Building - All Floors: Glass & Glazing, Metal Railings, Projection Screens 

 

 

 