Construction Updates

March 6, 2006

  • Floor 1 - Fire proofing of structural steel, interior framing (steel studs), plumbing and electrical rough-in
  • Floor 2 - Mechanical/electrical rough-in at steel deck, placed concrete on the deck 3/10/06, plumbing and electrical rough-in
  • Floor 3 - Plumbing and electrical rough-in
  • Floor 4 - Steel erection
  • Floor 5 - Steel erection

 

 

Previous construction updates

Page maintained by Dorita Tessier
Last update on April 18, 2006