Construction Updates

March 13, 2006

      Work Activities This Week

  • Utility Tunnel - Placed concrete for last slab section
  • Floor 1 - Continued work on interior framing; plumbing and electrical rough-in;
  • Floor 2 - Mechanical/electrical rough-in at the steel deck, ran top track for interior metal stud walls, interior framing and plumbing/electrical rough-in
  • Floor 3 - Placed concrete deck 3/17/06, plumbing/electrical rough-in
  • Floor 4 - Steel erection, steel deck, metal stairs
  • Floor 5 - Steel erection, steel deck, metal stairs
  • Roof - steel erection and roof framing

Previous construction updates