      Work Activities this Week

  • Floor 1: Hang/Tape/Finish Sheet Rock
  • Floor 2: Hang/Tape/Finish Sheet Rock
  • Floor 3: Rough Carpentry, Insulation (Batt), Hang/Tape/Finish Sheet Rock, Rough-Ins: Electrical (Wire and Cable)
  • Floor 4: Hollow Metal Door Frames, Rough Carpentry, Mechanical Insulation, Rough-Ins: Fire Protection, Electrical
  • Roof / Building Envelope: Insulation- Exterior Walls / Decks, EPDM Roofing / Flashing and S.M.-High, Ice and Water Shield / Dry-In

 

 

 