Construction Updates

July 24, 2006

      Work Activities this Week

  • Site Work: Sanitary Sewer Lines
  • Floor 1: Lighting Fixtures
  • Floor 2: Electrical Rough-In (Pull Wire), Seismic-Reframe Walls, Painting
  • Floor 3: Hang / Tape / Finish Sheet Rock, Electrical Rough-In (Pull Wire), Seismic-Expansion Joints / Sheet Rock
  • Floor 4: Hang / Tape / Finish Sheet Rock, Electrical Rough-In (Pull Wire), Seismic-Expansion Joints / Sheet Rock
  • Floor 5: Electrical Rough-In at Ceiling, Plumbing Rough-In, Seismic-Expansion Joints
  • Roof / Building Envelope: Ice and Water Shield / Dry-In, Masonry (Started this Week), Windows (Started this Week)
  • Building / All Floors: Hydraulic Elevator Installation (Started this Week), Metal Railings (Stair Pan Concrete)

 

 

 