      Work Activities this Week

  • Site Work: Storm Drainage - East (Connecting Downspouts)
  • Floor 1: Painting (Walls), Acoustical Ceiling Grid (Hanging Wires)
  • Floor 2: Hang / Tape / Finish Sheet Rock, Rough-In: Electrical (Pull Wire)
  • Floor 3: Hang / Tape / Finish Sheet Rock, Rough-In: Electrical (Pull Wire)
  • Floor 4: Hollow Metal Door Frames, Rough Carpentry, Batt Insulation, Hang / Tape / Finish Sheet Rock, Rough-In: Electrical (Pull Wire)
  • Floor 5: Electrical Rough-In at Walls
  • Roof / Building Envelope: EPDM Roofing / Flashing & SM High, Ice and Water Shield / Dry-In, Building - All Floors, Metal Railings.

 

 

 