Construction Updates

January 30, 2006

  • Placed topsoil and final grading of infiltration gallery area
  • Prepared subgrade, installed rebar for next 40 feet of utility tunnel floor
  • Installing piping for 1st floor slab
  • Structural steel erection completed to above 3rd floor
  • Installing steel decking on 2nd and 3rd floors 