Construction Updates

April 10, 2006

      Work Activities This Week

  • Utility Tunnel - FIP footings, Slab, Foundation walls, Set unistrut rack,  Rough-ins: Mechanical, Electrical
  • Floor 1 - Rough-ins: Fire Protection, Electrical
  • Floor 2 - Interior framing, Mechanical Insulation, Rough-ins: HVAC, Plumbing, Electrical
  • Floor 3 - Interior framing,  Rough-ins: Plumbing, Electrical
  • Floor 4 - Structural framing
  • Floor 5 - Steel erection, Steel deck

 

 

 